Power and signal edges no longer act as fluid paths in the mock solver
(a water demand was previously routed through the pump's power cable).
Also: bundled demo diagram, visual e2e script with dev-mode editor hook,
plan checklist completed.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>